CUSTOM:
THIS PRODUCT SPECIFICATIONS. PACKAGING CAN BE CUSTOMIZED ACCORDING TO CUSTOMER NEEDS, OEM
JSAGE:
1、CLEAN THE SUBSTRATE SURFACE:THE SUBSTRATE SURFACE MUST BE DRY,CLEAN, NO DUST,NO OIL. DO NOT WORK ON WET SUBSTRATE SURFACE.
2、CONSTRUCTION REQUIREMENTS:INSTALLTHE GROUTING GLUE ON THE SPRINKLER HEAD,GO DEEP INTO THE BOTTOM OF THE CONSTRUCTION GAP, AND INJECT THE GROUTING GLUE INTO THE CONSTRUCTION SEAL,THE RECOMMENDED DEPTH IS 1-2CM,SUCH AS THE GAP IS TOO DEEP OR HOLLOWING,THE GAP MUST BE FILLED WITH FOAM STRIPS OR FINE SAND BEFORE CONSTRUCTION. IT SHOULD BE ABOUT 2MM LOWER THAN THE ROAD SURFACE.
3、TEMPERATURE:THE RECOMMENDED OPERATING TEMPERATURE IS 5°C TO35°C. IN WINTER,THE OPERATING TEMPERATURE IS 5℃-40℃. USE OUTSIDE THIS TEMPERATURE RANGE WILL AFFECT PRODUCT PERFORMANCE.
4. REFERENCE AMOUNT:TAKING THE GAP OF 1CM DEEP AND 1CM WIDE AS AN EXAMPLE, A BAG OF 500ML CAULKING GLUE CAN BE CONSTRUCTED ABOUT 6 METERS,DEPENDING ON THE CONSTRUCTION.